The Leading News & Information Service For The Facilities, Workplace & Built Environment Community

Manila’s New Energy Efficient Bank HQ

Manila’s New Energy Efficient Bank HQ
15 January 2025
 

Foster + Partners’ BDO Unibank Inc. Campus Manila challenges the idea of traditional air-conditioned high-rise towers.

 

Watch the Video

 


 

The project consolidates five urban plots into a single, cohesive campus featuring two high-rise towers and a triple-volume public space.

 

Image

Picture: a CGI of the proposed new towers, showing their full height and weaved-style façade. Image Credit: Foster + Partners

 

The campus includes a public museum for exhibitions, a 3,000-square-meter meeting and event space, and landscaped areas with artwork.

The design team has carried out extensive solar analysis on the façades to determine which areas receive the highest levels of sun exposure. These areas are shaded by the woven metal mesh infill screens that are inspired by traditional weaving patterns. At night, the façade is illuminated by concealed interior light fittings.

 

Image

Picture: a CGI showing the ground floor of the property with a public seating and lots of plants. Image Credit: Foster + Partners

 

The design incorporates 70 per cent on-site water recycling, radiant cooling systems, and renewable energy, aiming for Green Mark Net Zero Energy status. The project is also pursuing the Green Mark Super Low Energy certification, a first in the Philippines.

Picture: a CGI showing a foyer with large amounts of plants, a seating area and escalators. Image Credit: Foster + Partners

Article written by Ella Tansley | Published 15 January 2025

Share



Related Articles

London Olympia Exhibition Hall Transformation Nears Completion

The £1 billion project to return London Olympia to its “people’s palace” status is nearing completion. SPPARC and Heatherwick Studio aim to...

 Read Full Article
Mace to Lead Landmark Retrofit Scheme in London

Mace has been appointed to deliver one of the largest building reuse projects in the City of London, at 65 Gresham Street. The extension, designed by Squire &...

 Read Full Article
Greater Bay Area Sports Centre Close to Completion

The Greater Bay Area Sports Centre in Guangzhou, China, is set to complete in June 2025. The project, designed by Zaha Hadid Architects, will open in November for the...

 Read Full Article
British Library Extension Confirmed

The much-anticipated plan to extend the Grade I listed British Library is set to go ahead.   Watch the Video   >   Proposals to...

 Read Full Article
Morgan Sindall Named as Preferred Contractor for Hemisphere One

Morgan Sindall Construction has been appointed by Sciontec as the preferred contractor on the Hemisphere One laboratory and workspace development in...

 Read Full Article
Inside the Old Trafford Stadium District Masterplan

Manchester United’s Old Trafford is set to be regenerated into a world-class football destination.   Watch the...

 Read Full Article
Consultation Opens for 31-Storey Fenchurch Street Tower

Detailed proposals for the redevelopment of 130 Fenchurch Street have been launched for further consultation.   Watch the...

 Read Full Article
Plans Submitted for 46 Storey Office at 63 St Mary Axe 

AXA IM Alts has submitted a planning application for a 635,000 sq ft office in the Square Mile. The plans for 63 St Mary Axe feature 46 storeys of office space, a...

 Read Full Article
Egypt Football Stadium With Sunken Pitch Designs Revealed

Designs for the first home for Al-Ahly Football Club in Cairo have been revealed by Gensler.   Watch the Video   >   Egyptian...

 Read Full Article
New Images of London’s Lowest Whole-Life Carbon High-Rise Development

Foster + Partners have published new CGIs of The Round at 18 Blackfriars Road, set to be London’s lowest whole-life carbon high-rise development.   Watch...

 Read Full Article