BRE Announces Winners Of BREEAM Awards 2026
BRE has revealed the winners of its annual BREEAM Awards 2026 - a celebration of the projects, organisations and people leading the way in sustainable building design,...
Read Full Article
For years, the commercial real estate sector has treated the "smart building" primarily as a technology upgrade - a conversation initiated by facilities managers or IT directors armed with vendor shortlists and operational budgets. Yet according to a new strategic analysis by LMG1, framing digitalisation as a purely technical exercise is precisely why so many projects fail to deliver a clear return on investment.
Instead, LMG argues that turning an asset smart is fundamentally a commercial and financial decision about how a property earns, how it is financed, and how exposed it is to tightening regulations. Technology is merely the mechanism used to execute that decision.
At the heart of the issue is an organisational disconnect. Most smart building initiatives involve two key stakeholders who rarely sit at the same table: the "revenue generator" responsible for financial performance, and the technical or operational lead responsible for building systems. When the person holding the budget has no say in delivery, and the person delivering the technology has no accountability for the financial return, projects stall. Often, the finance director asks what a building will earn and is handed a software brochure, while the IT director asks what the asset needs to achieve and is handed an arbitrary budget line.
The Commercial Imperative
From a purely financial perspective, the market is already forcing asset owners to act. Global office utilisation has climbed from 49% in 2024 to 56% in 2026, with 62% of organisations now mandating fixed in-office days. As space works harder, tenants are increasingly paying a premium for verified quality. Grade A offices accounted for 73.6% of Central London take-up in 2024, while BREEAM Excellent and Outstanding spaces command rents 15% higher than lower-rated equivalents.
While there is no universal standard for what constitutes a "smart" building, digital infrastructure provides the data required to achieve and prove these lucrative sustainability and connectivity certifications. Offices with advanced digital infrastructure secure an average 4.1% rental premium in Central London, and BREEAM-rated prime assets sell at roughly a 10% premium.
Simultaneously, debt markets and regulators are narrowing the options for underperforming buildings. With all-in debt costs jumping 70 to 100 basis points in just three months, lenders have become sharply selective; a stabilised City office recently attracted 15 bids, compared to just two for a weaker asset. Meanwhile, regulatory pressure continues to mount. In June 2026, the UK Government confirmed plans requiring privately rented non-domestic buildings over 1,000 square metres in England and Wales to reach an EPC B rating by 2031, where cost-effective.
The Operational Reality
Despite the clear commercial drivers, operational leaders are right to point out that financial returns do not materialise automatically upon installing new sensors. Industry data shows that projected energy savings from advanced building controls vary wildly - between 20% and 50% - making guaranteed short-term paybacks difficult to promise. Furthermore, legacy system integration remains a major technical hurdle, and gathering raw data does not automatically translate into actionable intelligence without dedicated expertise.
Crucially, split incentives often mean that those who pay for upgrades, those who operate the building, and those who benefit from lower energy bills are entirely different parties. Even proven strategies like condition-based maintenance - which costs up to 40% less than reactive repairs - fail without proper staff training and management commitment.
Bridging The Divide
LMG concludes that these hurdles are not failures of technology, but failures of governance and business-case alignment. To bridge the gap between finance and operations, asset owners must establish a single, shared set of numbers before engaging vendors. Some organisations are already tackling this by appointing dedicated liaisons who sit within energy and facilities teams while reporting directly to finance, translating operational efficiencies into pounds and pence.
Ultimately, LMG advocates for a structured diagnostic approach that maps a portfolio’s regulatory and market exposure, quantifies the financial impact, and establishes a sequenced roadmap before any technology is specified. By placing the investment, the expected return, and the delivery plan on a single page, financial leaders can see exactly what every pound of digitalisation buys, while IT and operations teams gain a clear mandate on what to deliver and how success will be measured.
1. Strategic Analysis by LMG – see here.
Picture: A split-screen banner with a modern glass office building with white text reading "Seeing Beyond the Technology" on a dark green background.
Article written by Dave Mapps | Published 19 November 2026
BRE has revealed the winners of its annual BREEAM Awards 2026 - a celebration of the projects, organisations and people leading the way in sustainable building design,...
Read Full ArticleThe Crown Estate has unveiled the next phase of its West End development pipeline – the largest ever in its history – with two major developments at 10...
Read Full ArticleSynopsis: A smart building can understand how it is being used, respond to the needs of its occupiers, and continually improve its performance over time. This...
Read Full ArticleMiklos Magyar, Digital Design Manager at chapmanbdsp, argues too many firms still think of BIM as a mere modelling tool but in fact it is capable of far, far...
Read Full ArticleMajor building rating systems, including the Building Research Establishment and the International WELL Building Institute, want to reform how sustainable building...
Read Full ArticleThe Royal Institute of British Architects has developed a Smart Building Overlay to the 2020 RIBA Plan of Work. Watch the...
Read Full ArticleFM provider Service Works Global has released a new white paper that details the seven steps for creating a smart building. The paper dispels the assumption...
Read Full ArticleRanjeet Bhalerao is a chartered engineer and CEO and Co-Founder of Mortar IO. ThisWeekinFM met up with Ranjeet to discuss the current challenges facing the commercial...
Read Full ArticleInfogrid has received funding from Original Capital, SoftBank Vision Fund 2, JLL Spark and several others. The smart building technology company has raised $90 million...
Read Full ArticleThis May, exhibitors will showcase hundreds of new FM products and solutions at ExCeL London at the Facilities Show 2023. Visitors this year will have the chance to...
Read Full Article