The Leading News & Information Service For The Facilities, Workplace & Built Environment Community

Chucked Crowbar Causes Flashover Catastrophe

The un-isolated 400V ac which caused a flashover and burns.
30 April 2019
 

Two companies have been fined after a worker attempted to test if high voltage equipment was isolated by throwing a crowbar at it - it wasn't and a skin melting flashover occurred.

Chelmsford Magistrates Court heard how on the 12th April 2017, two demolition workers employed by sub-contractor RB Haigh & Sons were removing electrical distribution equipment from a switchgear room at the former Molecular Products site in Thaxted, Essex.

Mr Alan Banks had been told by the principal contractor that the electrical equipment had been isolated. To reassure his colleague that it was safe he threw a crowbar at the 400V ac equipment. This came into contact with live exposed wires, causing a flashover and temperatures of several thousand degrees, followed by a subsequent fire. As a result, Mr Banks suffered serious burn injuries and was immediately hospitalised.

An investigation by the Health and Safety Executive found that the task being undertaken had not been properly planned and suitable control measures were not implemented to ensure the isolation of the power supply. The principal contractor, A J Wadhams & Co Ltd failed to follow the clear procedures outlined in their risk assessments and method statements, which identified all equipment must be treated as live unless written authorisation proved otherwise.

 

Electricity at Work

Russell Haigh and Stuart Haigh (Partners of R B Haighs & Sons) of Thaxted, Essex, pleaded guilty to breaching Regulation the Electricity at Work Regulations 1989 and were fined £80,000 and ordered to pay costs of £3,882.65.

AJ Wadhams & Co Limited trading as Wadham Homes of Charterhouse Street, London, pleaded guilty to breaching Section 3(1) of the Health and Safety at Work etc Act 1974, and have been fined £80,000 and ordered to pay costs of £3,816.60.

 

Always check

After the hearing HSE inspector Adam Hills said “This incident has had a significant impact on Mr Banks life and the injuries could so very easily have been fatal. Had the companies followed the control measures outlined in their respective risk assessments, then this incident would not have occurred. Never assume that an electrical supply is disconnected. Always check with the Distribution Network Operator or a qualified electrician to obtain written proof of isolation before commencing work.”

Picture: The un-isolated 400V ac which caused a flashover and burns.

Article written by Brian Shillibeer | Published 30 April 2019

Share



Related Articles

Support Service Company Fined For Brain Injury Fall

A company providing a range of airline ground support services has been fined after an employee fell from a height of more than two metres - suffering fractures and a...

 Read Full Article
Chemical Co Convicted At Christmas

Just before Christmas, a chemical company (LMA Services Ltd) was sentenced for breaches that led to a fire. Meanwhile, a fall from height has cost Sir Robert McAlpine...

 Read Full Article
HSE Injury And Ill-Health Statistics Released

October 30 saw the HSE releases the annual injury and ill-health statistics for Great Britain showing that 28.2 million working days were lost due to work-related illness...

 Read Full Article
Hotel All At Sea Over Asbestos

Two companies have been fined. RJW Building Solutions, a contractor carrying out refurbishment work at the Sea Hotel in South Shields and Hotel 52, the client, were...

 Read Full Article
Leak And Ladder Lead To Bad Mix At Chemical Co

An employee inspecting a steam leak at height fell to the ground when the ladder he was on failed. The employee of Vertellus Specialties UK fell two metres and suffered a...

 Read Full Article
Lending A Hand Costs Security Guard His Fingers

A security guard has lost his fingers after being asked by a groundworks contractor to lend a hand to do a job he was not employed or skilled to do. Elsewhere, seven...

 Read Full Article
Well Blow Me Down - Director Fined For Being Blown Off Roof

A director of a construction has seen his company (along with two others) fined when he was blown off an unsafe roof.  The three firms, Bowmer and Kirkland,...

 Read Full Article
Lanes Fined £500,000 After Worker Injured In Fall

Lanes Group PLC have been fined £500,000, with £9,896.19 costs, after pleading guilty to one offence under the Work at Height Regulations 2005. Westminster...

 Read Full Article
147 Dead - 2018/19 Fatal Injury Stats Released

July 3 saw the HSE release their annual provisional workplace fatality figures for 2018/19. 147 workers died between April 2018 and March 2019 (a rate of 0.45 per...

 Read Full Article
Waste Companies Maim And Kill

A company in the recycling sector has been fined over a manual handling of loads issue and two other firms in the same business have been fined for separate...

 Read Full Article